For concrete contractors pricing driveways, patios, sidewalks, and slabs where the number depends on square footage, thickness, finish, and site prep that isn't always visible from the street. Break the job down by square footage and finish, then send a clean, professional estimate before the client calls the next bidder.
Works for driveways, patios, sidewalks, foundations, and stamped or decorative concrete — every field is editable to match the job.
Create Estimate NowDownload a blank PDF, Word, or Excel template — or create one online in 60 seconds (no sign-up required).
No sign-up required · Takes ~60 seconds
State total square footage and slab thickness (4 inches is standard for driveways and patios, 5-6 inches for areas carrying vehicle traffic). Thickness directly drives concrete volume and cost — a client comparing your bid against a thinner competitor's slab isn't comparing like for like, so put the thickness in writing.
Detail excavation depth, base material (typically 4-6 inches of compacted gravel), and grading for drainage. Skipping proper base prep is the single biggest cause of cracked and heaving concrete — itemizing it shows the client why your bid isn't the cheapest, and protects you if a low-prep competitor's slab fails later.
Specify rebar or wire mesh reinforcement and spacing, since this affects crack resistance and is often skipped by lower bidders to cut cost. Note if fiber-reinforced concrete is being used instead of or in addition to rebar/mesh — it's a value differentiator worth calling out by name.
Broom finish (standard, slip-resistant), smooth trowel finish, exposed aggregate, or stamped/decorative concrete are priced very differently — stamped concrete alone can double the per-square-foot cost. Name the exact finish and, for stamped work, the pattern and color so there's no ambiguity at pour time.
State joint spacing (commonly every 8-12 feet for driveways) and note that joints are placed to control where cracking happens, not to prevent it entirely — concrete cracks are largely a matter of where, not if. Setting this expectation before the pour heads off a common post-installation complaint.
Note that concrete typically needs 24-48 hours before foot traffic and 5-7 days minimum before vehicle traffic (full cure takes 28 days). Clients parking on a driveway too early is a common cause of surface damage that gets blamed on the installer — put the timeline in writing.
| Description | Amount |
|---|---|
| Demo and haul-away of existing driveway (640 sq ft) | $2,240.00 |
| Excavation and compacted gravel base, 4" depth | $1,800.00 |
| 4" concrete driveway, broom finish, 640 sq ft | $5,760.00 |
| Wire mesh reinforcement | included above |
| Control joints, saw-cut, every 10 ft | $320.00 |
| Concrete sealer application | $450.00 |
| Debris removal and site cleanup | $180.00 |
Example pricing for illustration — your rates will vary by market and scope.
Standard broom-finish concrete (driveways, patios, sidewalks, 4" thick) typically runs $6-$12 per square foot installed, including base prep and basic reinforcement. A typical 2-car driveway (600-700 sq ft) runs $4,500-$8,500. Sidewalks and small patios often carry a higher per-foot rate due to smaller total volume and more edge/form work relative to area.
Decorative and stamped concrete runs $12-$22 per square foot depending on pattern complexity and coloring method (integral color versus acid stain versus stain-and-seal). Exposed aggregate finishes run $10-$18 per square foot. Structural work like footings and foundation slabs is typically priced by cubic yard of concrete plus labor, running $130-$180 per cubic yard delivered in most US markets as of 2025-2026.
Excavation and base prep can be 20-35% of total project cost on sites needing significant grading, tree root removal, or old-concrete demo and haul-away — demo of an existing driveway alone often runs $2-$5 per square foot. Always price current ready-mix delivery rates, since concrete pricing has moved with cement and fuel costs and a stale quote can eat your margin on a large pour.
Create your concrete estimate online in under a minute. No account required.
Concrete work should generally be quoted, not estimated, once you've assessed the site — square footage, access for the concrete truck, and existing grade are all things you can measure and see before the pour, and the material cost (concrete by the cubic yard) is a known, current number from your supplier. An estimate makes sense only when pricing from a lot survey before a site visit, particularly for new construction where grading hasn't happened yet. The one factor that can still move price after a walkthrough is what excavation reveals — old buried debris, unexpectedly soft soil, or a higher water table can require additional base material or drainage work, so a contingency clause for subsurface conditions is worth including even on a firm quote.
Most states require a general or specialty (concrete/masonry) contractor license above a project-value threshold, and some require it for any paid concrete work. Structural work like foundations often has stricter licensing and inspection requirements than flatwork like patios and sidewalks. Check your state contractor licensing board before bidding larger jobs.
Concrete curing is temperature-sensitive — pouring below roughly 40°F requires cold-weather additives or blankets, and pouring above 90°F requires faster finishing and more water management to avoid surface cracking. Note weather-contingency language on the estimate for jobs scheduled near seasonal extremes, since a pour may need to be rescheduled.
30-50% at signing is common, since you're committing to a scheduled concrete delivery that's expensive to cancel or reschedule last-minute. Some contractors also collect a second draw at pour day and the balance after cure — check your state's rules on deposit caps for home improvement contracts before setting a percentage.
Concrete cracks as it cures and shifts with temperature — control joints manage where cracking happens, but they don't prevent hairline cracking entirely. Stating this on the estimate, along with your joint spacing, prevents a normal hairline crack from becoming a warranty dispute six months after the pour.
Confirm pricing with your ready-mix supplier no more than 30 days before quoting a job, since cement and aggregate costs shift with fuel and demand. For jobs scheduled more than a month out, note on the estimate that pricing is subject to confirmation closer to the pour date if material costs move significantly.
Fill it out online, download a professional PDF, and email it to your customer — free, no account needed.
Create Free Estimate