Built for remodeling contractors pricing kitchens, bathrooms, basements, and whole-home renovations where selections aren't locked and existing conditions are unknown until demo starts. Break the job into scope and allowances, price it with a realistic contingency, and send a document that sets expectations instead of setting up a fight.
Works for kitchen and bath remodels, basement finishes, and room additions — built around allowances and phases so it flexes as selections get made.
Create Estimate NowDownload a blank PDF, Word, or Excel template — or create one online in 60 seconds (no sign-up required).
No sign-up required · Takes ~60 seconds
Break a remodel into rooms or phases — demo, rough-in, drywall, finishes — the same way you'd break a new build. This is what lets you price a partial change (client adds a pantry) without re-pricing the whole job, and it's what makes a progress-payment schedule make sense to the client.
Cabinets, countertops, tile, fixtures, and flooring are rarely chosen before the estimate is signed. Carry a stated allowance per category and note that overages bill at cost plus markup. This is the most important line item in remodeling — undocumented allowances are the number one cause of final invoices that surprise clients.
Remodels open up walls that new construction never had — rot, outdated wiring, undersized plumbing, asbestos in old flooring or insulation. Include a contingency line (commonly 10-20% of project cost) explicitly for conditions found after demo, and state that anything beyond it requires a signed change order before proceeding.
If you're removing a wall, note whether it's load-bearing and whether an engineer's letter or permit is required. Older homes frequently trigger code-driven upgrades — GFCI outlets, egress windows, smoke detector interconnection — that aren't optional once a permit is pulled. Price these explicitly rather than assuming they're free extras.
For occupied-home remodels, state dust containment measures, whether a temporary kitchen or bathroom will be set up, work hours, and how pets or children factor into scheduling. This isn't just customer service — it materially affects your labor and setup/teardown time each day.
Tie draws to milestones: deposit, demo complete, rough-in passed, drywall, finishes, final. Many states cap the deposit percentage for home improvement contracts, so check local rules before setting the number. A published schedule on the estimate prevents "when do I pay next" from becoming its own conversation.
| Description | Amount |
|---|---|
| Demolition: kitchen cabinets, countertops, flooring | $2,800.00 |
| Cabinet allowance (client selection, semi-custom) | $14,000.00 |
| Countertop allowance — quartz, installed | $5,200.00 |
| Plumbing rough-in relocation (sink and dishwasher) | $2,650.00 |
| Electrical: new circuits, under-cabinet lighting, GFCI updates | $3,100.00 |
| Flooring allowance — LVP, 280 sq ft installed | $3,360.00 |
| Contingency (15% of scope, for conditions found after demo) | $4,700.00 |
| Permit and plan review fees | $650.00 |
Example pricing for illustration — your rates will vary by market and scope.
Midrange kitchen remodels are running $28,000-$80,000 depending on layout changes and cabinet grade, with upscale kitchens (custom cabinetry, high-end appliances) commonly exceeding $100,000. Bathroom remodels run $12,000-$35,000 for a full gut, with powder room refreshes as low as $5,000-$10,000. Finished basements run $30-$75 per square foot depending on whether plumbing (a bathroom) is added.
Whole-home renovations that touch multiple rooms and systems typically land between $100 and $250 per square foot, with high-end gut renovations pushing past $300. Additions run higher than new construction per square foot — $200-$450 — because of tie-in work, matching existing finishes, and often keeping part of the home occupied and livable during construction.
Labor rates in 2025-2026 generally run $50-$110 per hour burdened for general trades, with licensed electricians and plumbers at $80-$150. Most remodelers carry 10-20% contingency on top of the base estimate specifically for demo surprises, separate from the 10-20% overhead-and-profit markup — conflating the two is a common reason remodelers underprice risk.
Create your remodeling estimate online in under a minute. No account required.
Remodeling is the trade where the estimate-versus-quote distinction matters most, because opening walls in an existing home reveals things no one can see beforehand. Give an estimate at the design or bidding stage — it should carry a stated contingency and a note that pricing firms up after demo. Convert to a fixed-price or cost-plus contract once selections are locked and, ideally, after a demo walkthrough confirms there's no hidden rot, outdated wiring, or code issue. Handle everything found after that point through written, signed change orders — verbal "just go ahead and fix it" conversations are the single most common source of remodeling payment disputes.
Almost every state requires a general contractor license above a project-value threshold (often $500-$1,000), and some require it for any paid remodeling work regardless of size. Kitchen and bath remodels that touch electrical or plumbing may also require those trades to be licensed separately if you're not performing that work yourself. Check your state contractor licensing board before bidding.
10% is reasonable for a cosmetic remodel with no wall changes; 15-20% is standard for anything involving demo of walls, floors, or ceilings in a home over 20-30 years old, where wiring and plumbing surprises are common. Older homes and additions that tie into existing structure justify the higher end.
10-33% at signing is typical, but several states cap it by law — California limits home improvement deposits to $1,000 or 10% of the contract price, whichever is less. Confirm your state's rule before setting a percentage, since violating a deposit cap can void the contract's enforceability in some states.
State the allowance dollar amount per category on the estimate, and note that any selection exceeding it is billed at the vendor's cost plus your standard markup, due before the item is ordered. This keeps the base estimate accurate to what's actually being built and turns overages into a simple math conversation instead of a dispute.
Yes — state whether you're providing design/drawings or the client is bringing their own, and who pulls permits (usually you, since most jurisdictions require a licensed contractor of record). If an architect or structural engineer is needed for a wall removal or addition, note it as a separate cost so it isn't assumed to be included.