A remodeling quote is a contract-sized document for one homeowner and one room. It has to say what gets torn out, what goes in, who picks the finishes and what happens when you open a wall and find a problem. Include these items:
Price a remodel room by room and phase by phase, then split each phase into labor, materials and allowances. A bathroom is not one number. It is demolition, plumbing, waterproofing, tile, fixtures, drywall and paint, and each one has its own cost and its own place in the schedule. Use your own prices. The figures on this page are examples only.
An allowance is a dollar amount you put in the quote for something the homeowner has not picked yet. It is not a price for the item, it is a budget. Label every one as an allowance, state the unit, such as $9 per square foot of tile, and say what the allowance covers, for example material only or material and delivery. If the homeowner picks tile at $14 a square foot, the difference is added on the final invoice. If they pick $6 tile, they get a credit. Without that sentence, an allowance turns into an argument.
You cannot see the subfloor under a tub or the wiring behind a wall until the demolition is done. Do not guess and bury a number in the price. State that the quote covers the visible condition, then list the likely surprises with a price per unit and a note that they are billed only if found. For a bathroom that might be subfloor replacement at a rate per square foot, or rotted framing at an hourly rate. The homeowner sees the possible cost up front, and you are not eating it if it appears.
Every change to the scope gets written down, priced and signed before the work happens. That includes a moved valve, an upgraded tile pattern, an added niche and the subfloor repair from the contingency line. A change order names the change, the price, the effect on the schedule and the new contract total. Say on the quote that verbal changes are not billable and not binding on either side. This one rule prevents most remodeling disputes.
Moving plumbing, changing electrical or altering walls usually needs a permit, and a bathroom remodel often does. Rules vary by city and county, so check before you quote. Put on the quote who pulls the permit, who pays the fee and which inspections apply, such as rough plumbing before the walls close. Tie a payment to the rough-in inspection, because that is a natural point where the customer can see progress and you can see the walls still open.
Remodels run for weeks, so bill in stages tied to finished work, not to calendar dates. A typical schedule is a deposit at signing, a payment at rough-in inspection, a payment when tile is complete and the balance at the final walkthrough. Keep each payment close to the value of the work done so you are never far ahead of or behind the job. Some states cap how large a deposit can be on a home improvement contract, so check your state before you set the number.
A quote is a fixed price for the written scope. An estimate is an approximate price that can change. Remodels sit in between because of hidden conditions. Give a fixed quote for the work you can see and measure, use allowances for what the homeowner has not chosen and use contingency lines for what you cannot see. If you only have a rough scope and no plans, call it an estimate and say so.
Use the construction estimate template for the early number, then send a quote once the scope is fixed.
A homeowner reads a remodeling quote as the whole job. Write down what is not in it. Typical lines are:
Here is what a remodeling quote looks like using our template, for a full 5x8 hall bathroom. Amounts are examples only:
When the customer accepts, you can convert the quote to an invoice and bill each milestone as you reach it.
Choose your preferred format below: online builder or downloadable template.
No sign-up required · Takes ~60 seconds
No sign-up · Instant download
Prefer to fill it out yourself? Download a blank template to print or edit.
List your details, the homeowner and address, the scope by phase with measurements, allowances for owner selections, a hidden-damage line, the permit, milestone payments, exclusions and a valid-until date.
A dollar budget for something the homeowner has not picked yet, such as tile or a vanity. Label it as an allowance and state that the final invoice adjusts up or down to the actual cost.
Quote the visible condition, then list likely problems with a price per unit, billed only if found. Anything beyond that needs a written change order signed before the work.
It depends on your state. Some states cap deposits on home improvement contracts, so check your state's rules. Then tie later payments to finished milestones, not to dates.
A quote is a fixed price for the written scope. An estimate is approximate. Quote what you can see and measure, use allowances for open selections and say plainly what is excluded.
Yes. The Word, Excel and PDF downloads are free, with no sign-up and no watermark, and the online builder needs no account.
Quoting a different job, or ready to bill this one? Try these:
For design fees, sourcing and site visits
For construction projects
For early-stage project pricing
For small repair and install jobs
For interior and exterior painting jobs
For billing construction and remodeling work